We specialise in turn key subsea cable repairs with only one ambition:

Restoring the availability of your export cable, array cable or (HVDC) interconnector in the shortest possible time to minimise your losses and insurance claim.

Fastest Repair of Subsea Cables

  • Fault reporting

    A subsea cable fault always happens unexpected and compromises the security of supply of your windfarm, your interconnector or your island power supply. Contact us to discuss availability and contract conditions. Our sole target is to restore power as fast as possible without compromising quality requirements.

  • Fault localisation

    Upon contract award we will nominate two or even three project manager which will enable us to work around the clock. We will then mobilise a fault location crew. First a pre location measurement will be carried out, as such a an indicative location of the cable fault will be determined. Offshore cable fault localisation is a highly complex technology which needs to be carried out by specialist.

  • Mobilisation of repair asset

    Availability of a repair asset is key and highly detemines the total repair time of the cable. We have multiple options and can arrange for repair assets all over the world. Our crew will be mobilised within 24 hours upon contract award and will coordinate the mobilisation of the repair asset. 

  • Cable repair and jointing

    Once the cable fault has been localised offshore the damaged cable will be (cut) and lifted onboard of the repair asset. Spare cable and two joints will be installed and as such the electrical integrity of the cable will be restored. Our crews will work 24/7 in shifts to enable the fastest response time.

  • Testing and restoring power

    Once the repaired cable has been lowered onto the seabed (and buried or protected) the circuit can be tested with a test voltage applied by an external (series resonant or DC) voltage source, or, in the absence thereof, a soak test with system voltage can be carried out before the circuit is taken back into operation.


CONTACT US

CONTACT@SUBMARINECABLEREPAIR.COM

OUR SERVICE

We repair Subsea Cables from 33kV up to 525kV in the fastest possible timeframe.


Our typical clients are Transmission System Operators, OFTO's, Offshore Wind Farm Operators, Insurance Companies, Distribution Companies & Offshore Installation Contractors. 

All services

Restore availability fast

Repair of power cables of all cable manufacturers

Minimise Outage Time

by Webmaster 22 Jan, 2021
Being prepared saves time and costs.
by Webmaster 22 Jan, 2021
"The previous time one of our export cables failed it took us 67 days before the circuit could be re-energized. This time it took us 32 days only and if it happens again we can even do it faster."